Office: (352) 489-4144
Fax: (352) 489-4741
Email: troyburrell@bellsouth.net

Burrell Engineering, Inc.
Civil Engineering

 Projects

Citrus County Transit Site
This site was the redesign of a county complex that included the removal of a building and replacement of a second building along with the layout redesign to allow for regrading the new parking area. This redesign required the installation of a new drainage system and rerouting of a complex network of existing utilities with minimal disruption.

Multiple SECO Substation Designs
Site designs of multiple electical substations for Sumpter Electric Coop. in Lake and Sumpter counties requiring permitting through appropriate Water Management Districts, county, and FDOT.

Progress Energy ESP Heavy Haul Route Design
Design of a temporary access road for a large multi-wheeled haul vehicle to transport large components of the work required by the clean air act. Included verification that existing underground piping could handle the transport loads.

Central Landfill Leachate Force Main
Design and permitting of approximately 4 miles of force main and pump upgrades to remove an existing WWTP from service at pump landfill Leachate to the County control sewer system.

Hernando Dollar General
This commercial site included the layout and design of parking and drives for a retail store. It included the design of water, sanitary and storm sewer systems with on-site drainage retention. It also required the installation of an on-site septic system.

Heritage Park Phase 2
Engineering design and permitting of a renovation of existing streets and abandoned railroad R/W within the City of Williston to create a park and provide upgraded parking facilities as well as traffic calming in a high traffic part of the City. Permitting included drainage permitting with SWFWMD and the City of Williston. Services also include periodic observation of construction and construction administration.

Nokomis Point Drainage Improvements
Engineering design and permitting of drainage improvements to alleviate flooding problems on an existing City Street in Crystal River. Services included drainage design and permitting with the SWFWMD and City of Crystal River. Services also included periodic observation of construction and construction administration.

Williston CDBG Water Main Extension
Engineering design and permitting of 20,000 lf of water main extension for the City of Williston. Services included design and permitting with DEP, County R/W permitting, FDOT Utility crossing permitting, CSX Railroad permitting for a utility crossing as well as permitting through the City of Williston.

Coventry Street Resurfacing Project
Engineering design and permitting of a 2.5 mile street resurfacing project in Marion County. Services included design and permitting with Marion County MSTU Department as well as preparation of an assessment plat.

Wacahoota Substation Site Plan
Engineering design and permitting of a 5 acre Electrical Substation Facility for Clay Electric in Levy County. Services included drainage design and permitting with DEP, County permitting, as well as NPDES permitting through FDEP.

Williston Church of God
Engineering design and permitting of a 13 acre Community Church Facility including the upgrade of 2 City Rights of Ways for access to the project. Services included drainage design and permitting with SWFWMD, City permitting, as well as water and sewer design and permitting through FDEP.

East Williston Park
Engineering design and permitting of a 24 acre City park. Park amenities included baseball, softball, soccer, and basketball courts, restrooms, driveways and parking. Services included park design and drainage permitting with SWFWMD.

Suwannee Landing, Suwannee County
Engineering design and permitting of a 227 lot subdivision in Suwannee County. Services included design of a curb and gutter internal subdivision roads and drainage conveyance facilities. Permitting included drainage permitting with SRWMD and Suwannee County. Services also include periodic observation of construction and construction administration.

Sandlin Sand Mine
Engineering design and permitting 60 acre sand mine operation. Permitting included drainage permitting with SWFWMD and local special use permitting with Levy County.

Williston SW Sewer Extension
Engineering design and permitting of 4,000 lf of gravity sewer main in an existing residential neighborhood. Permitting included sewer permitting with FDEP and the City of Williston. Services also include periodic observation of construction and construction administration.

Bellamy Ridge
Engineering design and permitting of a 132 lot subdivision within the Citrus Hills II DRI in Citrus County. Services included design of curb and gutter internal subdivision roads, drainage conveyance facilities, sewer collection facilities including a lift station and water distribution facilities. Permitting included drainage permitting with SWFWMD and Citrus County and sewer and water permitting with FDEP. Services also include periodic observation of construction and construction administration.

 

We look forward to working with you.

Work Performed

  • Commercial Site Plans
  • Subdivisions
  • Site development
  • Church Site Renovations
  • Municipal infrastructure
  • Watershed delineation
  • Roadway design
  • Storm sewer design
  • Sanitary sewer design
  • Lift Station design
  • Drainage retention design
  • Drainage retention certification